Contract & government
Aircraft for work
that has to happen
Resource sector rotations, government tasking and essential services — into strips where reliability matters more than a specification sheet.
Why us
We are built around
long contracts
Ad-hoc charter fills gaps. Contracts are what the business is structured for — aircraft held for a programme, crew current on the route, and a base that can carry the maintenance and scheduling load over years rather than weeks.
We have held multi-year programmes in the resource sector, and currently fly a season-long tour programme into remote Australia that runs years forward.
The aircraft
Nine seats, and it can
take a dirt strip
The King Air B200 — nine seats, pressurised and air-conditioned, on twin PT6A-42 turboprops, with the payload and strip performance to reach sites that jets cannot. Citations and Phenoms are on line where speed matters more than strip access.
How the flying actually works
What a rotation actually involves
FIFO rotations, government tasking and essential services are not a run of charters with a discount on the end. What you are buying is an aircraft held against a programme, crew kept current on the route, and a maintenance plan built around your schedule rather than ours.
What follows is what that actually involves, so you can compare us properly against whoever else you are talking to.
Strips, not just airports
Most resource-sector and government work does not finish at a certified aerodrome. It finishes at an ALA. The King Air B200 is on line for exactly that reason — pressurised, twin PT6A-42, and able to work off gravel and compacted earth that a jet cannot touch.
What decides whether we can take your strip:
- Length, at the weight we need to carry
- Surface and width
- Obstacle clearance on both approaches
- Whether it stays useable after rain
Send us the strip and we will assess it. If it is marginal you will hear that from us before the contract, not from a crew on the day.
Why a B200 rather than the alternatives
Against the alternatives, a piston twin is unpressurised and slower, and a jet cannot use the strip at all. What the B200 brings:
- Pressurised — climbs over weather rather than picking through it, which is the difference between a rotation that runs and one that gets cancelled
- Air-conditioned — matters more than people expect at a Queensland site in February
- Nose and aft baggage — crew-change bags do not have to come out of the cabin
Turboprop on an unsealed strip — length at weight, surface and obstacle clearance decide whether we can take it.
Payload against sector length
The trade is always fuel against seats, and nine seats with full tanks is rarely the same flight.
- A long sector into a strip with no refuelling means carrying the return fuel, and that comes straight out of payload
- Short multi-leg days with fuel available en route let you fill the cabin
Give us the sectors and the passenger numbers and we will tell you which of those you are in, before you build a schedule around the wrong one.
Crew, duty, and what actually breaks a schedule
Flight and duty limits are what people forget when a rotation gets designed in a spreadsheet. An early departure into a remote strip, a day of waiting on the ground, and a late return can run past a duty period even when the flying hours look modest.
We check a proposed schedule against duty before we quote it, and we will tell you where it needs a second crew, a night away, or simply a different departure time.
When an aircraft goes unserviceable
Across a multi-year programme it will happen. What matters is what sits behind it.
We maintain the fleet through CAR 30 and CASR Part 145 approved organisations, depending on the aircraft, on an elected system of maintenance scheduled around your programme rather than dropped into the middle of it. We run three type families out of our own 2,500 square metre hangar at Archerfield, so cover is arranged rather than improvised.
Audit and approvals
Resource-sector clients generally require an aviation risk standard audit before carriage, and government tasking carries its own approvals on top. Every flight we run is conducted under a CASA air operator’s certificate.
We put the certificate, certificates of currency and our maintenance organisation’s details in with the tender rather than after it. If your procurement team works from a template, send it through — we would rather complete your form than hand you ours.
What to send us to get a real number
- Origin and destination — with the strip name or coordinates where it is an ALA
- Frequency, and the days it runs
- Passenger numbers, and any freight
- Season length or contract term
- Whether the aircraft is held exclusively for you, or can carry other work between your sectors
With those, we come back with an aircraft, a rate basis, and what we would need to hold it. Without them, anyone giving you a number is guessing.
Next step
Start with the shape of the job
A short conversation is usually enough to tell whether this is workable. If it is, we put the detail together from there.
